It was a long day:
- I sanded the interior in preparation for the second coat of off-white.
- Cold-molded and fiberglassed the fore-peak that’s for the anchor and rope.
- Drilled 1 1/8″ scupper holes and installed the pvc pipe for both the aft deck and the motor well.
- Installed 2) 1 1/2″ S.S. “D” ring in the stern for tie down straps.
- Started building the galley counter.
I’m pooped and calling it a day! Started at 5:45am and ended at 5:00 pm.