I sanded the white and put the first coat of varnish on all bright work, then left for Longview, Washington to pick up the custom cut safety glass for the windshield. I got back to the shop at noon and put on the 2nd coat of varnish. Tomorrow I will put the 3rd and last…
Author: coffeeadmin
Pelicano 18 – Coordination
Today was a busy day of coordination. After making templates for the windshield safety glass, I drove to Longview, Washington, dropped off the cuddy cabin foam for the cushions to Longview Upholstery and dropped off the glass template to Twin City Glass. I then connected with the canvas guy who followed me back to the boat shop…
Pelicano 18 – Windshield Reassembled
Reassembled and epoxied the fir windshield together. I also cut and installed all the Douglas fir wood plugs and applied two coats of paint to her exterior.
Pelicano 18 – Fir Windshield
Sanded the wood filler and then built the fir windshield. Started at 7:45 am and ended at 3:30 pm.
Pelicano 18 – Cockpit Inwales
The inwales around the cockpit were built and installed today. Started at 8:00 am and ended at 1:30 pm.
Pelicano 18 – Hatch and Door
Today, I built and completed the companion way hatch and door. Started at 1:00 pm and ended at 6:30 pm.
Pelicano 18 – Deck Beams
After finishing up the hands sawn deck beam for the companionway, all the deck beams were complete. These deck beams make up the ceiling for the cuddy cabin. I then finished building the cabin itself. Next come the building of the companionway hatch and door. Started at 9:45 am and ended at 5:45 pm.
Pelicano 18 – Fir Cabin Ceiling Beams
Today, I wood flour epoxy glued the side cabin walls to the hull and cut and installed all the fir cabin ceiling beams. I should have the cabin completely constucted tomorrow. Started at 8:00 am and ended at 3:30 pm.
Pelicano 18 – Paint and Gunwales
The interior was sanded interior to prep for the 3rd coat. I also built and installed all walk around gunwales. Finished the day by painting the 3rd coat of paint. Tomorrow I start building the cabin. Started at 6:00 am and ended at 5:00 pm.
Pelicano 18 – Galley and Interior
Today, I finished the galley shelf, made up the patterns for the cuddy cabin cushions and painted the 2nd coat of off-white to the interior. Afterwards, I drove to Longview, WA to drop off the cushion patterns and order the galley sink – they had a nice little stainless steel 10″ round one. Started at…