5×10 Devlin Skiff: Seating and Oar Lock Bases Posted on May 11, 2012May 15, 2012 by coffeeadmin May 11, 2012 worked from 8am-noon. Today I built the seating and oarlock bases. I then disassembled all and re-fit them with epoxy. Then I steamed the gunwales and fit them with clamps and screws. They will dry to shape overnight. [Show as slideshow]