June 23 from 4:00 pm to 8:00 pm: epoxy wood floured the two bottom panels to the bulkheads, longitudinals and the keel seam.
June 24 from 9:30 am to 1:00 pm: cut limber holes and fared out all hard to get to hardened epoxy wood flour application.
June 25 from 9:00 am to 3:00 pm: attached the two chine panels and then proceeded to epoxy wood flour them to the bulkheads and bottom panels.