Today, I started at 7:00 am setting the #4 bulkhead and finishing strongback set up by 9:30am. I started setting the bottom panels at 9:45 and continued to get the bottom panels set and the bow stitched. The inside bottom to the keel, bulkheads and longitudinals are ready for epoxying. Finished at 1:30pm.