Today I finished and put up the 2×6 interior wall. This wall has all the ABS rough-in drain plumbing in it. It rained most of the day!
Month: June 2014
Marina – Framing
I’ve started framing the marina house this week. We just got our temporary job-site electrical service so I can put my 18v battery tools away and start using the real thing next week.
Fawns and Fishing
Yesterday I took this photo of this sweet little fawn in the flower beds right by the front porch. Today was one of those days! That crazy Josey had a great day fishing for Summer Steelhead.
River Traffic and Steelhead
This morning I was on the river early trying my luck at catching a steelhead. As we were fishing, a small US Coast Guard ship was making way up the Columbia river to join a number of other ships for the annual Portland Rose Festival celebration. Soon after, we saw another smaller USCG Cutter and a Brusco tug towing…
Marina – Concrete Mono Pour
The concrete mono pour! We pour the footings, walls and the slab floor all at once! This pour took just short of 30 yards.