Today, I wood flour epoxy glued the side cabin walls to the hull and cut and installed all the fir cabin ceiling beams. I should have the cabin completely constucted tomorrow. Started at 8:00 am and ended at 3:30 pm.
Month: August 2010
Pelicano 18 – Paint and Gunwales
The interior was sanded interior to prep for the 3rd coat. I also built and installed all walk around gunwales. Finished the day by painting the 3rd coat of paint. Tomorrow I start building the cabin. Started at 6:00 am and ended at 5:00 pm.
Pelicano 18 – Galley and Interior
Today, I finished the galley shelf, made up the patterns for the cuddy cabin cushions and painted the 2nd coat of off-white to the interior. Afterwards, I drove to Longview, WA to drop off the cushion patterns and order the galley sink – they had a nice little stainless steel 10″ round one. Started at…
Pelicano 18 – Interior Details
It was a long day: I sanded the interior in preparation for the second coat of off-white. Cold-molded and fiberglassed the fore-peak that’s for the anchor and rope. Drilled 1 1/8″ scupper holes and installed the pvc pipe for both the aft deck and the motor well. Installed 2) 1 1/2″ S.S. “D” ring in…
Pelicano 18 – Interior Prep
July 28 from 12:15 pm to 6:00 pm: milled ash, fir and cedar. Then disassembled the floors and sole and sanded to prep for fiberglass that will be taped to all interior seams. July 29 from 6:00 am to 2:00 pm: fiberglass taped to all interior seams . . . very nasty job!! July 30…